Curb Side Bay #7
Steps / Railings / Weather Wall
Contents
  • 2 - Sets of Steps
  • 4 - Step Handrails
  • 2 - Front Platform Support Beams
  • 1 - Rear Platform Support Beam
  • 2 - Front Platform Guardrails (Narrow)
  • 2 - Rear Platform Guardrails (Wide)
  • 3 - Curb-Side Expando Support Legs
  • 1 - Rear Platform Support Leg
  • 8 - Segments of NEP "Weather Wall"
  • Edge Protectors & Spare Plywood
Loading Instructions
  • Fold all 8 "Weather Wall" segments in pairs. Load into rear floor of bay.
  • Load 2 sets of steps w/ legs shortened. 1st on floor, 2nd on rack.
  • Add 4 Expando supports & 4 handrails.
  • Rear platform support beam goes with Expando supports.
  • Place 2 front platform support beams on top of upper set of steps.
  • Load 2 "wide" guard rails onto support beams.
  • Fill remaining space w/ edge protectors.
  • "Narrow" guard rails load onto front platform support beams at Bay #S7.
Supershooter 6
Belly Bays
Venues
Specifications
Floorplan
Hotels
Terms | Privacy | Accessibility | Support
© Venue Stars Inc 2025 - ALL RIGHTS RESERVED