Curb Side Bay #7
Steps / Railings / Weather Wall
Contents
- 2 - Sets of Steps
- 4 - Step Handrails
- 2 - Front Platform Support Beams
- 1 - Rear Platform Support Beam
- 2 - Front Platform Guardrails (Narrow)
- 2 - Rear Platform Guardrails (Wide)
- 3 - Curb-Side Expando Support Legs
- 1 - Rear Platform Support Leg
- 8 - Segments of NEP "Weather Wall"
- Edge Protectors & Spare Plywood
Loading Instructions
- Fold all 8 "Weather Wall" segments in pairs. Load into rear floor of bay.
- Load 2 sets of steps w/ legs shortened. 1st on floor, 2nd on rack.
- Add 4 Expando supports & 4 handrails.
- Rear platform support beam goes with Expando supports.
- Place 2 front platform support beams on top of upper set of steps.
- Load 2 "wide" guard rails onto support beams.
- Fill remaining space w/ edge protectors.
- "Narrow" guard rails load onto front platform support beams at Bay #S7.